Define the working geography within Tampa, FL: office location, commute radius, hybrid expectations, field travel and relocation can all change the search.
The criteria below illustrate how to define a search. They are not a claim that every professional has every listed credential or is currently available. Separate essential requirements from preferences, then verify the evidence for each candidate.
Water & Wastewater Treatment
ROLES TO DISTINGUISH
Treatment Plant Design Engineer · Process Engineer · Water and Wastewater Engineer · Process Mechanical Engineer
CREDENTIALS & TECHNICAL CRITERIA
PE in Florida · Unit process design experience · Plant hydraulics and hydraulic profiles · State environmental agency permitting
PROJECT EXPERIENCE TO EVALUATE
Treatment plant expansion and upgrade · Advanced treatment and nutrient removal · Headworks and biosolids handling · Plant master planning
Reuse, Supply & Resource Programs
ROLES TO DISTINGUISH
Water Resources Engineer · Reuse Program Engineer · Water Supply Planner
CREDENTIALS & TECHNICAL CRITERIA
PE · Water management district permitting · Reclaimed water system design · Supply and demand modeling
PROJECT EXPERIENCE TO EVALUATE
Reclaimed water distribution systems · Aquifer storage and recovery · Regional supply planning · Conservation and alternative supply programs
Conveyance, Collection & Rehabilitation
ROLES TO DISTINGUISH
Collection Systems Engineer · Pipeline Design Engineer · Lift Station Engineer · Water and Wastewater Engineer
CREDENTIALS & TECHNICAL CRITERIA
PE · WaterGEMS and SewerGEMS · Trenchless rehabilitation methods · Condition assessment practice
PROJECT EXPERIENCE TO EVALUATE
Force main and gravity sewer design · Lift and pump station rehabilitation · Inflow and infiltration programs · Large-diameter transmission mains
Stormwater, Floodplain & Coastal
ROLES TO DISTINGUISH
Stormwater Engineer · Floodplain Engineer · H&H Engineer · Drainage Engineer
CREDENTIALS & TECHNICAL CRITERIA
PE · CFM · ICPR, HEC-RAS, HEC-HMS, EPA SWMM · Water management district ERP
PROJECT EXPERIENCE TO EVALUATE
Watershed and basin master planning · Flood mitigation and conveyance improvements · Tidal and surge-influenced drainage · FEMA map revisions